ONE ADDITIONAL LANE ADJACENT TO THE ENCLOSED WORK ZONE MAY OCCUR 12:01 AM - 5 AM NIGHTLY WITH NO NOISE OPERATIONS. (IV) FIVE FEET OF RAIL ROAD TRACKS. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. FOR ANY CAPITAL WORK INVOLVING CURB-TO- CURB RESURFACING OF THE STREET,PERMITTEE AND RESIDENT ENGINEER FOR THE SPONSORING AGENCY SHALL NOTIFY THE APPROPRIATE DOT BOROUGH ADMIN. Freeway, about 619-001: Temporary Positive Barrier (6 Sheets), about 619-002: Type III Construction Barricades (2 Sheets), about 619-004: Portable Temporary Wooden Sign Support, about 619-005: Details on Placement of Portable Temporary Rumble Strips, about 619-010: Work Zone Traffic Control General Notes, about 619-011: Work Zone Traffic Control General Tables & Legend, about 619-022: Shoulder Closure/Lane Encroachment, Official Electronic Standard Specifications and Standard Sheets website, 619-001: Temporary Positive Barrier (6 Sheets), 619-002: Type III Construction Barricades (2 Sheets), 619-004: Portable Temporary Wooden Sign Support, 619-005: Details on Placement of Portable Temporary Rumble Strips, 619-010: Work Zone Traffic Control General Notes, 619-011: Work Zone Traffic Control General Tables & Legend, 619-022: Shoulder Closure/Lane Encroachment. WORK ALLOWED 8 AM TO 4 PM SATURDAY. Upon completion of the inspection, HIQA makes a final determination as to whether the location is suitable for a canopy placement. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Who has exhibited a pattern of disregard for the rules or orders of NYC DOT or the terms or conditions of permits issued by NYC DOT or for other applicable law. The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. Section 3.5 Other Provisions Pertaining to Permits contains more information on holds. 2. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. RESTORE ALL TRAVEL LANES WHEN SITE IS UNATTENDED CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. 40 Worth Street 8th Floor Tel: 718-780-8280 The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. Standard Drawings are not currently available for download from the shaded states. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. There are two categories of HIQA holds: Holds for Specific Permit Type or Unique Street Treatment and Holds that May Be Placed on the Permittee. **DOT's lighting division generally classifies cross streets as local roadways*DOT's lighting division generally classifies avenues and boulevards as collector roadways. These are in addition to the "Common Requirements" listed at the beginning of this section. MAINTAIN A 5-FOOT CLEAR SIDEWALK WHEN WORKING ON THE ROADWAY AND A 5-FOOT PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY MEETING NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY WHEN WORKING ON THE SIDEWALK. Special and separate procedures govern emergency work: one for utility access covers (including those for "manholes," valve covers and grates) and one for street openings/excavations. The CGL policy should provide coverage in the amount of no less than $1 million combined single limit per occurrence, except for applications for permits to place a crane on a street, which requires $3 million combined single limit per occurrence. 30-30 Thomson Avenue, 4th Floor NO EQUIPMENT/MAT'L MAY BE PLACED ON TOP OF SENSORS. AN EMBARGO WILL BE IN EFFECT FOR THIS AREA SATURDAY AUGUST 2, 9 AND 16 FROM 12:01AM TO 6:00PM. 16 Court Street, 15th floor Once the canopy is installed, the canopy installer or authorized agent must contact the HIQA borough office for a final inspection to determine whether the installed canopy conforms to the submitted plans. NO WORK MAY EXTEND MORE THAN 8 FEET FROM CURB WITHOUT EXPLICIT AUTHORIZATION OF MTCCC. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. APPLICANT INFORMATION (SOLE PROPRIETORSHIP). Inevitably, street excavations to install or access this infrastructure disrupt the normal activity of New York's streets, causing frustration and confusion for local residents and businesses. If repairs have not been made within the 75 day period, the City may make the repairs and bill the property owner for the cost of the repairs. MUST COMPLY WITH DEP NOISE REQUIREMENTS. WALKWAY MUST MEET NYCDOT SPECIFICATIONS. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. Most vault work also requires plan approval and a permit from DOB. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. Office hours: 8:30 AM - 4:30 PM, The Bronx IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. Visit the DEC website at the following address to determine the appropriate contact http://www.dec.ny.gov/63.html, Metropolitan Transportation Authority (MTA) Bus Operations Unsafe Conditions If the permittee has been notified and fails to address an unsafe condition, all future permit requests may be placed on hold until the unsafe condition has been eliminated. Permits may be voided and reissued only within three business days of issuance. New York City Department of Transportation 3030 Third Avenue Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). Download about 619 . At the foundation of the city that never sleeps lays a network of streets that helps keep New York and New Yorkers moving forward. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. The hold is to review the proposed work and set conditions for the work and/or the street restoration. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. Under the surface, the same streets support the city's water, sewer, power and telecommunications infrastructure, as well as its subway tunnels and building vaults. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. HIQA Central Office SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. It also helps NYC DOT to identify opportunities for joint bidding and to coordinate the timing of the agency's resurfacing and reconstruction activities. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. A permit is required to place any construction trailer or similar structure in the street. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. New York, NY 10004 NOTARIZE THE FORM. 95 Prospect Park West PERMITTEE IS PARTICIPATING IN CORE DRILLING PILOT PROGRAM. More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. DOT currently specifies 3000 Kelvin as the color temperature for all luminaires. FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. Office hours: 8:30 AM-3:30 PM. THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. The fee for reissuance may be found in Section 2-03 of the Highway Rules. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. Effective 8/5/19 Closed until Further Notice STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. WORK HOURS 7 AM - 10 PM MON-FRI, AND 8 AM - 10P M SATURDAY, AND 9 AM TO 10 PM SUNDAY. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. Typically, a valid permit issued by the New York City Department of Buildings (DOB) is required prior to application for permits in this category. If there is no hold, the permit is issued to the applicant after appropriate payment is received. Questions regarding permit registration can be directed to the central Permit Office. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. Bronx, NY 10455 Applications for most permit types can be submitted to the Manhattan Central Permit Office. 80-30 Park Lane Tel: (718) 390-2080, The Bronx SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. FULL INTERSECTION RESTORATION WILL BE REQUIRED WHEN MORE THAN 50% OF THE INTERSECTION IS EXCAVATED. SIDEWALK RESTORATION AT THIS LOCATION REQUIRES SIDEWALK STANDARD 4.13C. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. Following issuance of the Emergency Street Opening Permit Number, the permittee must submit an application for a regular Street Opening Permit within two business days (Highway Rules, Section 2-11(g)). Note: All distances indicate measurements from nearest edge of any object to closest edge of vault. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHWEST QUADRANT OF THE INTERSECTION. View more information on how to respond to Sidewalk Violations. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. The Third Edition of the Street Design Manual renews the Manuals status as a living document and reinforces its role as a critical resource for those working on projects in New York Citys public right-of-way. Revenue hold If the permittee owes NYC DOT money for an open Corrective Action Request (CAR) or Jolt Elimination Team (JET) bill, all future permit requests may be placed on hold until the bills are paid. Kew Gardens, NY 11424 Brooklyn.Forestry@parks.nyc.gov 24 West 61st St., 5th Fl. United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. The instructions below apply to corporations, partnerships, joint ventures and individuals. The completed application, affidavit, a stamped self-addressed envelope and a certified check made payable to NYC DOT for the permit fee (currently $70.00 for up to 300 linear feet) must be mailed to: The applicant submits permit application, proof of insurance (originally supplied during the registration process) and supporting documentation for review as to accuracy and completeness. (646) 892-1388/1389 WORK SATURDAY AND SUNDAY. HIQA also releases many holds. NYC Parks & Recreation NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. TWO HUNDRED TWENTY OF THE LABOR LAW, PAID TO THOSE SO EMPLOYED. These holds can only be released by OCMC executive staff. The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. NYC DOT coordinates street opening and other construction on streets. Applicant Information (Corporation, LLC or LLP), 1C. RESTORE CONCRETE BASE. NO WORK EXCEPT FOR EMERGENCY WORK MAY OCCUR. 8:30 AM to 4:30 PM, Manhattan A HIQA inspector must be present during the restoration. PERMITTEE MAY OCCUPY CURB LANE 24/7 FROM 10/4 THROUGH OCTOBER 10/15/2010. 59 Maiden Lane, 37th floor Re-Dig (RED) hold In cases where an inspection has revealed a failed restoration and permittees have been told to redo the entire restoration, a RED hold will be placed. Bronx, NY 10457 59 Maiden Lane, 34th Floor SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. All public and private actions must comply with all applicable laws, rules, and regulations, not solely those listed below. The permittee may apply for a re-issuance online, or in-person by accessing either theApplication to Re-Issue Permitsor theApplication to Re-Issue Governmental Work Permit(s). WORK 9 AM TO 7 PM EXCEPT SUNDAY. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. New York State Code of Rules and Regulations, Laws of New York(use this webpage to search for the below laws), Administrative Code of the City of New York, Zoning Resolution of the City of New York, American Association of State Highway and Transportation Officials (AASHTO), Institute of Transportation Engineers (ITE), National Association of City Transportation Officials (NACTO), NYC Department of Design and Construction, NYC Department of Environmental Protection, NYC Mayor's Office for People with Disabilities, NYS Department of Environmental Conservation, Downtown Brooklyn Traffic Calming Study (NYC DOT: 2004), Project Development & Design Guide (Massachusetts Highway Department: 2006) [PDF], San Francisco Better Streets PlanDraft for Public Review (City and County of San Francisco: June 2008), Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities (New Jersey DOT/Pennsylvania DOT: 2008) [PDF], Parks, Plants, and People: Beautifying the Urban Landscape (Lynden B. Miller: 2009), Trees in the Urban Landscape: Site Assessment, Design, and Installation (Nina L. Bassuk and Peter J. Trowbridge: 2004), Permeable Interlocking Concrete Paver (PICP), Manual on Uniform Traffic Control Devices (MUTCD), National Historic Preservation Act, Section 106, New York State Department of Environmental Conservation (Title 6), New York State Environmental Quality Review Act (SEQR), New York State Historic Preservation Act, Section 14.09, New York State Department of Transportation (Title 17), A Policy on Geometric Design of Highways and Streets, 7th edition, A Guide for Achieving Flexibility in Highway Design, Guide for the Planning, Design, and Operation of Pedestrian Facilities, Guide for the Development of Bicycle Facilities, 4th edition, BIKESAFE: Bicycle Countermeasure Selection System, PEDSAFE: Pedestrian Safety Guide and Countermeasure Selection System, Designing Sidewalks and Trails for Access, Public Involvement Techniques for Transportation DecisionMaking, MUTCD (Manual on Uniform Traffic Control Devices), Roadside Best Management Practices that Benefit Pollinators, Designing Walkable Urban Thoroughfares: A Context Sensitive Approach, The Design and Safety of Pedestrian Facilities, Accessible Public RightsofWay: Planning and Designing for Alterations, The Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities, National Menu of Best Management Practices (BMPs) for Stormwater Management, Active Design Guidelines: Promoting Physical Activity and Health in Design, High Performance Infrastructure Guidelines: Best Practices for the Public RightofWay, Standards for Green Infrastructure (DEP: 2017), ProcedureGoverning Limited Survey for Green Infrastructure, Procedure Governing Limited Geotechnical Investigation for Right-of-Way Green Infrastructure Practices, PlaNYC Sustainable Stormwater Management Plan, Specifications for Traffic Signals and Intelligent Transportation Systems Construction and Equipment, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Select Bus Service Design Guidelines: Update, El-Space Toolkit: Strategies for Reclaiming Sites Beneath Elevated Transportation Infrastructure, Version 1.0, Park Design for the 21st Century: High Performance Landscape Guidelines, Native Planting Species Guide for New York City, Inclusive Design Guidelines: New York City, New York State Stormwater Management Design Manual, San Francisco Better Streets PlanDraft for Public Review, Smart Transportation Guidebook: Planning and Designing Highways and Streets that Support Sustainable and Livable Communities, New York State Environmental Conservation Law (ECL), New York State Vehicle and Traffic Law (VTL), Department of Citywide Administrative Services (Chapter 35), Department of Consumer Affairs (Chapter 64), Department of Design and Construction (Chapter 55), Department of Environmental Protection (Chapter 57), Department of Parks and Recreation (Chapter 21), Department of Small Business Services (Chapter 56), Department of Transportation (Chapter 71), Franchises, Revocable Consents, and Concessions (Chapter 14), Landmarks Preservation Commission (Chapter 74), Public Design Commission/Art Commission (Chapter 37), Contracts, Purchases and Franchises (Title 6), Environmental Protection and Utilities (Title 24), Department of Citywide Administrative Services (Title 55), Department of Environmental Protection (Title 15), Rules Governing the Construction of Private Sewers, Rules Governing the Use of the Water Supply, Department of Parks and Recreation (Title 56), Department of Small Business Services (Title 66), Franchise and Concession Review Committee (Title 12), Landmarks Preservation Commission (Title 63), Public Design Commission/Art Commission (Title 57), Rules of the City of New York (Title 43 and 62), U.S. Traffic Calming Manual (American Planning Association & American Society of Civil Engineers: 2009), Under the Elevated: Reclaiming Space, Connecting Communities (DOT and Design Trust for Public Space: 2015). POST SIGNS MEETING NYCDOT SPECS AT WORK ZONE AND AT BOTH INTERSECTIONS DIRECTING PEDS TO OPPOSITE SIDEWALK. Enter at least two names of corporate officers, director, managing agent, owners, partner, etc., with titles and telephone number. THIS PERMIT MAY BE EXTENDED ONCE ONLY, FOR A PERIOD OF 14 DAYS AT $40. These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). Further information on responding to Orders may be found in the Highway Rules, Section 2-02(e). WORK 7 PM-10 AM WEEKNIGHTS. PERMITTEE MUST EMAIL DEP AT. The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. The notice provisions specified in Section 2-02(g) of the Highway Rules are the minimum required for street operations. To have the hold released, the permittee must correct the unsafe condition, and then contact HIQA to arrange for an inspection.
Radio City Music Hall Font,
Medical Record Retention Requirements By State,
Articles N